Angola 2008 Portfolio
This page contains details and images of a recent project carried out
by paneltech Systems in Angola
The project in Angola actually consists of two installations in one project.
Two seperate bitumen storage facilities in two different locations, each
consisted of a loading station, tanker filling gantry and all associated
pump skids and control systems. The UK part of the work was complete by Christmas 2008
and installation is due to start Feb/March 2009. Paneltech were responsible for the
manufacture of all control and monitoring systems as well as all fabricated parts.
More details and images of this project will be posted on the site after on site
installations are complete.